Custom homes and restorations, Essex County, New Jersey
Week 36 36
SiteWeeks 1 to 3
Soil, slope, drainage and the trees worth keeping, marked out with you on the ground. The plan goes down in string before any machine arrives.
FoundationWeeks 4 to 9
Forty-two inches down, formed, inspected and poured. We backfill only after the town has signed off the walls.
FramingWeeks 10 to 17
Kiln-dried spruce at sixteen-inch centres, every header doubled. You see the frame before a single wall is closed.
RoofWeeks 18 to 24
Sheathing, underlayment and shingles, then the windows and the chimney. From here the inside stays dry.
KeysWeeks 25 to 36
Siding, trim, paint and planting, then a walk through every room with you. Then the keys, and a written warranty on all of it.
Three generations, counted
96%Of our last fifty jobs finished inside the week we promisedJob book, 2021 to 2026
They found rot behind the kitchen wall on day three, showed us, priced it on the spot, and still handed us the keys the week they promised.
What we take on
One room, one problem, fixed properly.
A written warranty on the work
Kitchens and baths rebuilt around how you live now.
Drawings for every change
Old houses brought back without losing what made them.
A record of original materials
Designed, permitted and built by one crew.
The house, and every plan for it
Every job starts with a walk through the house, at no charge.